Electric Boiler Power Staging

Utility companies bill on peak power consumption over time. When a site draws a peak of power from the grid that establishes a new ceiling which the utility bills you a Demand Charge for the next 11 months. You may never use that peak demand again but you must pay to have it available. Through power management controls and staging element usage the effects of demand charges can be minimized.